Utilities Information

The Town of Blanchard’s new treatment plant has the water production capacity of 5.0 million gallons per day (MGD) and replaces the outdated, undersized treatment facility located on Louisiana Highway 169 approximately, five miles southwest of the new plant site.

The development of the facility will provide a high quality, reliable water supply for the community’s four thousand plus (4,000+) water customers.  The treatment plant will also serve as a potable water supply for nearly two thousand (2,000) additional water customers on the Mooringsport, East Mooringsport, East Cove, Pine Hill, and Lakeview water systems. 

As designed, the project will also meet the long term potable water demand for an additional four thousand (4,000) water customers.  The facility can be efficiently and cost-effectively expanded to a total capacity of 10.0 million gallons per day (MGD) to meet the future water needs in north central Caddo Parish as those needs are identified for the next twenty years. 

The membrane type treatment process will be the first of its type in Caddo Parish and only the third of its kind in the State of Louisiana.

The project includes the following:

  1. A two-story, completely-enclosed water treatment building;
  2. Installation of approximately 53,800’ of 8”-24” water intake, transmission and distribution water lines;
  3. A 35’ deep raw water intake on Caddo Lake;
  4. Upgrades to an existing 1.0 MGD water booster station and construction of a 260,000 gallon water storage tank; 
  5. Rehabilitation of an existing 100,000 gallon elevated storage tank;  and
  6. Retro-fit 4,000 plus of  existing water meters with a Radio Frequency Interface (“RFI”)

Budget
The total cost of the project is estimated to be $16,987,000.00. The development is subsidized with loan funding from the Louisiana Department of Health and Hospitals – Drinking Water Revolving Loan Fund Program.

Contact Information

Office Hours: 7:30 A.M. - 4:00 P.M.
After hours call (318) 929-4500 for emergency repairs.

110 Main Street, Blanchard, LA
Office: (318) 929-2928
Fax: (318) 929-2447

Personnel

  • Jennie Ashby - Water Clerk, Billing Manager
  • Candy Foshee - Town Clerk
  • Crystal Palmer - Water Clerk
  • Maggie Caskey - Water Clerk

Utility Shop/Water Plant
318-929-4500

  • Cindy Leder- Administrative Assistant/Utilities
  • Perry Fuller - Utility/Sewer Manager
  • Lonnie Smith - Water Plant Supervisor
  • Greg Rambin – Wastewater Supervisor